RELATED




MESSAGE
PROJECT:
The subcritical high-temperature boiler water pump generator set produced by Blossom has been put into use in a power plant in Kazakhstan, with a power of 5000kw and a flow rate of 580 cubic meters per hour.

Blossom is responsible for the rectification of the entire power plant's water pump, which is the same size as the customer's old pump. The electricity from this power plant will be supplied to an entire town for use

CONTACT US